Jacuzzi Install Preparation Step

Author: admin  /  Category: Building Plan

Installing jacuzzi can be done alone, although the average producer has given “free installation” by their technicians. However, before the technicians arrived, there are basic things that need to be prepared in order to speed up the installation. Whatever it?

1. Prepare the floor.
Jacuzzi generally installed on a flat floor or flat water. This flat floor is required for the system to function properly jacuzzi. These include water jet circulation system and drainage system. Therefore, if the condition has not flat floor then make into flat.

2. Stabilize the floor construction.
Jacuzzi tub belonging to the weight, though not filled with water. When filled with water. Jacuzzi total weight greater if used for bathing. Besides weight depending on the size Jacuzzi tub and type of material. At least, when used, jacuzzi 1.000kg/meter weigh up square. Because of its weight, then consider re-construction of the building if they want to put the jacuzzi on the top floor of the house.

3. A solid framework.
In addition to the basic need of a flat, strong, and stable, jacuzzi framework also requires a solid wall. Jacuzzi around the frame must be given due weight retaining water pressure. Especially if the material his own jacuzzi was too strong.

4. Prepare electrical lines, water, and drainage.
Like ordinary bathtub, jacuzzi requires the installation of clean water, water disposal, and electrical installations. Plan the installation before the installation of all three. Ask the seller about jacuzzinya system specifications, as a reference to make electricity and water installations, including the placement of the jet pump.

5. Clean the area and do a test.
After installation, seal tightly so that the jacuzzi did not move at all. Previously, do a test on the system jacuzzi.